AUSTEEL STEEL MILL PROJECT

Austeel is developing a world-class steel operation capable of competing with the low cost high quality producers in the world.  Austeel’s extensive iron ore deposit in the Pilbara Region of Western Australia will produce a very high quality iron concentrate which can be further processed into direct reduced iron for conversion into final steel products.  The project comprises:

Western Australia

Steel Mill Site (currently finalising negotiations on the Site location)

The basic process is one of conversion of iron ore to steel by melting in a furnace (MELTSHOP), refining of the molten steel followed by rolling the hot steel into thick and thin slabs (CASTING BAY), followed by further treatments (HOT STRIP MILL and COLD COMPLEX) for the production of several different finished products for export. 

The project will be developed in three phases.

AUSTEEL STEEL PROJECT - PRODUCTS for SALE

PRODUCT
Phase 1
Phase 2
Phase 3
Total
 
HBI
450
0
450
900
SLAB
1000
5000
6000
12000
HR Coil reroll for sale
1900
0
1900
3800
HR Coil P+O for sale
400
0
400
800
CR Coil
400
0
400
800
Galvansied Coil
400
0
400
800
 
TOTAL
4450
5000
9550
19100